BESS Maxima

  • Energy Storage
  • Storage
Client
ENGIE
Country
The Netherlands
Period
2019-ongoing
Julien Denegre
Head of Business Stream Gas Infrastructures and Power Networks
Entrer en contact
IMAGE_TYPE: Photograph | GENRE: Documentary | EMOTION: Structured | SCENE: Battery storage units arranged in rows | LOCATION TYPE: Renewable energy facility | CAMERA MODEL: Fujifilm X-T4 | CAMERA LENS: 35mm | SPECIAL EFFECTS: Moderate lighting, soft shadows | TAGS: power grid, battery storage, energy infrastructure, renewable technology. hyper realistic, super detailed, 8K, clean, amazing, best photo, --chaos 50 --ar 16:9 --style raw --stylize 500 --v 6.1 Job ID: 54c509ec-6cab-4691-9ebb-963dad107dff
Services fournis
  • Basic design
  • Digital Tools
  • Quality assurance

The Challenge

ENGIE aims to enhance energy flexibility and grid reliability by constructing a Battery Energy Storage System (BESS) near the Maxima Power Plant in the Netherlands. The challenge lies in integrating this advanced storage solution into the existing energy infrastructure while ensuring high performance and operational safety from the outset.

The Solution

Tractebel has been entrusted with an Owner’s Engineering mission from the start of the construction phase. Our role includes design review, technical supervision, and quality assurance—ensuring that the BESS is delivered in line with ENGIE’s specifications and international best practices.

The Impact

Battery Energy Storage Systems like this one play a crucial role in strengthening grid resilience and stability. They enable the power grid to better absorb fluctuations, recover quickly from disruptions, and maintain a reliable electricity supply—supporting the broader transition to a low-carbon energy system.

Solutions numériques

Réinventez votre impact avec nos solutions digitales

Références

Notre contribution en Énergies renouvelables, production flexible et stockage

Toutes les références