BESS Maxima

  • Storage
  • Energy Storage
Client
ENGIE
Country
The Netherlands
Period
2019-ongoing
Julien Denegre - Tractebel
Julien Denegre
Head of Business Stream Gas Infrastructures and Power Networks
Get in touch
IMAGE_TYPE: Photograph | GENRE: Documentary | EMOTION: Structured | SCENE: Battery storage units arranged in rows | LOCATION TYPE: Renewable energy facility | CAMERA MODEL: Fujifilm X-T4 | CAMERA LENS: 35mm | SPECIAL EFFECTS: Moderate lighting, soft shadows | TAGS: power grid, battery storage, energy infrastructure, renewable technology. hyper realistic, super detailed, 8K, clean, amazing, best photo, --chaos 50 --ar 16:9 --style raw --stylize 500 --v 6.1 Job ID: 54c509ec-6cab-4691-9ebb-963dad107dff
Services provided
  • Basic design
  • Digital Tools
  • Quality assurance

The Challenge

ENGIE aims to enhance energy flexibility and grid reliability by constructing a Battery Energy Storage System (BESS) near the Maxima Power Plant in the Netherlands. The challenge lies in integrating this advanced storage solution into the existing energy infrastructure while ensuring high performance and operational safety from the outset.

The Solution

Tractebel has been entrusted with an Owner’s Engineering mission from the start of the construction phase. Our role includes design review, technical supervision, and quality assurance—ensuring that the BESS is delivered in line with ENGIE’s specifications and international best practices.

The Impact

Battery Energy Storage Systems like this one play a crucial role in strengthening grid resilience and stability. They enable the power grid to better absorb fluctuations, recover quickly from disruptions, and maintain a reliable electricity supply—supporting the broader transition to a low-carbon energy system.

Digital Apps

Re-imagine your impact with our digital solutions

References

Our contribution in Renewables, Flex Power Gen & Storage

All references