COO-Trois-Pont Pumped Storage Upgrade

  • Pumped Storage
Client
Electrabel
Country
Belgium
Period
2002 – 2020 (refurbishment phases)
David Levrat
Business Manager - Water
Kontakt aufnehmen
Erbrachte Dienstleistungen
  • Pre-Feasibility & Feasibility study
  • Owner's or Lender's Engineer
  • Technical & regulatory consultancy

The Challenge

Increase the storage and power performance of the existing Coo pumpedstorage plant by 7.5% while safeguarding reliable operations for the next 40 years. The upgrade had to be conceived and delivered on a live, gridcritical asset, balancing stringent technical, scheduling and regulatory requirements.

The Solution

Modification and expansion of the spillway and flood release facilities.

The Impact

Extended lifetime and increased capacity, reinforcing Belgium’s grid flexibility.

Digitale Apps

Gestalten Sie Ihre Wirkung neu mit unseren digitalen Lösungen

Referenzen

Unser Beitrag in Wasser

Alle Referenzen